Hello,



  • This field is for validation purposes and should be left unchanged.
EECO2 Privacy Policy

Water Assessments

We can analyse your entire site water consumption, identifying problem areas and projects which will aim to reduce water consumption.

The team will produce a report with a list of recommended projects and predicted water savings for each.

Working together with the site team, EECO2 can then organise implementing the agreed projects.

CASE STUDIES

Energy and water assessment workshop at client site in Australia

Australia | Pharmaceutical Manufacturing |

project brief

Energy and water assessment workshop at client site in Australia

OUR RESULTS

Energy savings identified (per year):

8,800 MWh

(26% reduction)

Water savings identified (per year):

10,900 cubic metres

(14% reduction)

Total cost savings identified (per year):

Aus$ 802,000

Read full case study

Creating a cost-effective plan to reduce energy consumption at the client site, whilst maintaining product quality.

Delaware, USA | Pharmaceutical Manufacturing |

project brief

The EECO2 team was brought in to a client site to help them reach their carbon and water targets. They focused on HVAC energy consumption & water consumption of the site.

OUR RESULTS

Energy savings and cost savings identified (per year):

9.5 GWh and $622,000

16% reduction and 24% reduction

Water savings identified (per year):

5.14 million Gallons

24% reduction

Emissions reduction (per year):

3,562 t CO2

20% reduction

Read full case study

EECO2 were tasked with developing a strategy to reduce water usage, as the water supply was at a critical level.

Cape Town | High Tech Industries |

project brief

With the aim of reducing water usage for the site, the EECO2 team worked with the site to develop a water reduction strategy to do just that.

OUR RESULTS

Water savings identified (per year):

47%

Water savings potential identified from projects

Water savings identified (per year):

16%

Water savings from rain water harvesting

Water cost savings identified (per year):

ZAR 562k

Read full case study

Identifying opportunities for energy and water usage reduction at a UK vaccine manufacturing facility

United Kingdom | Biopharmaceutical Manufacturing | HVAC, Energy efficiency, Energy assessment, BMS optimisation, Water assessment

project brief

EECO2 were commissioned to examine, quantify and report on the opportunities for energy and water usage reduction at a UK vaccine manufacturing facility

OUR RESULTS

Energy savings identified (per year):

4,283,000 kWh

23% reduction in site energy usage

Energy cost savings identified (per year):

£322,000

Water savings identified (per year):

13,674 m3

52% reduction in site water consumption

Read full case study

contact us today

Ready to speak to us about Environmental Sustainability? Speak to us today to find out what we can deliver for your business.

#COP26 President @AlokSharma_RDG said: “This wonderfully #innovative project will help communities around the world visualise how they can help achieve [#netzero]."

https://www.gov.uk/government/news/uk-cop26-presidency-to-unveil-visions-of-a-global-net-zero-future

Achieving high levels of energy efficiency is not something that should be seen as out of reach or cost-inefficient. Not only are #energyefficiency projects capable of significant cost saving, but they also have short payback periods and a positive NPV.

#carbonemissions #netzero

This week, @TheSMI announced the 10 #TerraCarta Transition Coalitions at the @G7, which aim to drive #sustainable investment. As a supporter of the Terra Carta, we are proud to continue these efforts and accelerate industry action.

#netzero #pharma #sustainability

Our Services

OUR CLIENTS

AbbVie

Aesica

ALKERMES

Allergan

Amgen

AstraZeneca

BAYER

Catalent

Eli Lilly

GlaxoSmithKline

Novartis

Pfizer

Pharmavite

Purogenix

Sanofi