Hello,



  • This field is for validation purposes and should be left unchanged.
EECO2 Privacy Policy

Latest News

EECO2 PROJECT AT CLIENT SITE IN MEXICO

Posted on


Recently, the EECO2 team visited an oral solid dose manufacturing site in Mexico. The team conducted a HVAC & BMS Assessment, including new GMP upgrade projects. In the end, there were a total of 11 projects identified.

With quantified savings of €198,000 – which is 12% of the total site energy cost! The projects have a simple payback period of 1.6 years.

HVAC design

Look out for the Case Study on this one!

To hear more about our energy efficiency solutions and pharmaceutical HVAC design, get in touch.

Follow us on LinkedIn

PREVIOUS POSTNEXT POST

browse latest news

Latest tweets

COVID-19: MANAGING RISK IN PHARMACEUTICAL HVAC SYSTEMS

We’ve updated our document to include additional information and FAQ’s (the basic guidance remains unchanged).

To access the document, visit:
https://www.eeco2.com/resources/details/?resource=covid-19-managing-risk-in-pharmaceutical-hvac-systems&id=1867
Any questions, info@eeco2.com

#COVID19 #advice #HVAC

We have created a document with practical advice to assess the risks and recommended appropriate action to minimize the risks associated with airborne transmission of Covid-19 (Novel Coronavirus).

Download the PDF here: http://www.eeco2.com/resources

We have created a document with practical advice to assess the risks and recommended appropriate action to minimize the risks associated with airborne transmission of Covid-19 (Novel Coronavirus).

Download the PDF here: https://lnkd.in/dT9ZvBB

Sign up to the knowledge hub

  • By completing this form, you confirm that we may contact you via email, that you are over the age of 16 and that we can send you periodic emails, containing useful and interesting information including our email newsletter. Please see our privacy policy for more information and to see how you can manage your consent.

  • Fields marked with an * are mandatory