Hello,



  • This field is for validation purposes and should be left unchanged.
EECO2 Privacy Policy

Latest News

INDIA VISIT

Posted on

Last month, the EECO2 team visited a client site in East India, specialising in sterile pharmaceutical manufacturing. The team conducted a final site survey for a fresh air pre-treatment project.

In total the team was on site for 8 days, taking final plant room and equipment measurements. Meeting with the site project team and site engineering team, making final decisions on the project. This included timelines, engineering methods and final budget.

The EECO2 team is pleased to report that the project will deliver substantial energy and cost savings, with a payback period of 1.4 years.

Keep an eye out for the Case Study for this project!

Whilst there, the EECO2 team explored the Indian culture which surrounded them, sampled traditional Indian cuisine and met some very hospitable locals.

INDIA TRIP

PREVIOUS POSTNEXT POST

browse latest news

Latest tweets

If you would like help with reducing energy consumption on your site, EECO2 can help... http://www.eeco2.com

#sustainability #energyefficiency #pharma #savings

A MEMU is being used to to prove energy savings of new energy efficient filters. Read more: https://www.eeco2.com/memu-installed-in-ireland/

http://www.eeco2.com/memu

#filters #HVAC #pharma #energymonitoring #savings #Ireland

Throwback to last month with some of the EECO2 team looking dapper at the ISPE UK Annual Awards Dinner, at Old Trafford Football Stadium, Manchester.

#ISPE #event #UK #blacktie #pharma #sustainability

@ISPEorg

Sign up to the knowledge hub

  • By completing this form, you confirm that we may contact you via email, that you are over the age of 16 and that we can send you periodic emails, containing useful and interesting information including our email newsletter. Please see our privacy policy for more information and to see how you can manage your consent.

  • Fields marked with an * are mandatory