Last month, the EECO2 team visited a client site in East India, specialising in sterile pharmaceutical manufacturing. The team conducted a final site survey for a fresh air pre-treatment project.
In total the team was on site for 8 days, taking final plant room and equipment measurements. Meeting with the site project team and site engineering team, making final decisions on the project. This included timelines, engineering methods and final budget.
The EECO2 team is pleased to report that the project will deliver substantial energy and cost savings, with a payback period of 1.4 years.
Keep an eye out for the Case Study for this project!
Whilst there, the EECO2 team explored the Indian culture which surrounded them, sampled traditional Indian cuisine and met some very hospitable locals.