LABORATORY OPTIMISATION AND UPGRADES FOR ENERGY EFFICIENCY

Site: | Location: Singapore | Sector: Pharmaceutical Manufacturing

project brief

EECO2 were tasked to reduce energy demand at the client site, without compromising on compliance or laboratory safety.

METHODOLOGY

EECO2 supported with a HVAC design review, defined project scope, managed local contractors.

EECO2 carried out the smoke visualisation trials and recommended a reduced fume cupboard capture face velocity, to deliver 20% energy savings.

The client then used this data to develop strategy for further improvement work.

SOLUTION

The main opportunities solutions for optimisation identified were as follows:

Reduce existing air change rates

Reduce existing fresh air volume

Improve plant operational maintenance

Optimise BMS system

Recommended upgrading laboratory fume cupboards to VAV

Recommended upgrade & control of warehousing facilities

Results

Energy savings identified (per year):

2,200 MWh

Energy cost savings identified (per year):

$347,000

Emissions reduction (per year):

985 tonnes

of carbon emissions

"Excellent technical knowledge of energy efficiency opportunities and quality of deliverables."
Engineering Director
Global Pharmaceautical Manufacturer

LIKE WHAT YOU SEE?

We can do this for you too. Speak to us today to find out what we can deliver for your business.

OUR CLIENTS

AbbVie

Aesica

ALKERMES

Allergan

Amgen

AstraZeneca

BAYER

Catalent

Eli Lilly

GlaxoSmithKline

Novartis

Pfizer

Pharmavite

Purogenix

Sanofi