Client: Global Pharmaceutical Manufacturer | Location: Singapore | Sector: PHARMACEUTICAL MANUFACTURING

Find out more

Previous case study

PROJECT BRIEF

EECO2 was tasked to reduce energy demand at the client site, without compromising on compliance or laboratory safety.
The client site had very high energy demands, driven by original HVAC design and layout with high air change rates and fresh air volumes.

METHODOLOGY

EECO2 supported with a HVAC design review, defined project scope, managed local contractors.

EECO2 carried out the smoke visualisation trials and recommended a reduced fume cupboard capture face velocity, to deliver 20% energy savings.

The client then used this data to develop strategy for further improvement work.

SOLUTION

The main opportunities solutions for optimisation identified were as follows:

Reduce existing air change rates

Reduce existing fresh air volume

Improve plant operational maintenance

Optimise BMS system

Recommended upgrading laboratory fume cupboards to VAV

Recommended upgrade & control of warehousing facilities

RESULTS

Energy savings identified (per year):

Energy savings identified (per year):

2,200 MWh

Energy cost savings identified (per year):

Energy cost savings identified (per year):

$347,000

Emissions reduction (per year):

Emissions reduction (per year):

985 tonnes

of carbon emissions