  • By completing this form, you confirm that we may contact you via email, that you are over the age of 16 and that we can send you periodic emails, containing useful and interesting information including our email newsletter. Please see our privacy policy for more information and to see how you can manage your consent.

  • Fields marked with an * are mandatory

ecco
Previous case study

IDENTIFYING HVAC ENERGY REDUCTION STRATEGIES FOR AN ORAL SOLID DOSE PHARMACEUTICAL MANUFACTURING FACILITY

Client: Global top 10 pharmaceutical company | Location: China | Sector: PHARMACEUTICAL MANUFACTURING

Download

Find out more

Previous case study

PROJECT BRIEF

To identify HVAC energy reduction strategies throughout various manufacturing spaces and laboratories at a single key manufacturing site and quantify potential cost savings.

METHODOLOGY

Data was requested from the client site on the energy consumption, HVAC system design, operation and critical product quality requirements. EECO2 analysed this data to determine the likely opportunities for efficiency improvements in each process area. During the site survey, potential opportunities were assessed on 80% of the HVAC systems. These were evaluated and discussed with key stakeholders, to determine a viable site plan to implement the improvements identified.

SOLUTION

We identified a number of strategies with significant cumulative energy savings, including:

Switch off fume cupboards out of hours, with appropriate controls in place.

Switch off or reduce air change rates of HVAC units in areas not currently used for production.

Rebalance air distribution systems to minimise extract whilst providing sufficient outside air for dust extractor and leakage to maintain pressurisation.

Install bypass to dehumidifiers in liquids area and raise humidity setpoint within compliance limits.

Improve door sealing and fabric to reduce air leakage.

We also recommended a practical implementation plan which would ensure that changes can be made safely and efficiently whilst maintaining quality and compliance. The plan was agreed in principle with all stakeholders, including Quality Assurance and Validation groups. Much of the implementation can be delivered by the local site team, supplemented by EECO2 technical and project management expertise when requested.

CLIENT TESTIMONIAL

You always open our eyes to the savings opportunities that exist and how to go about implementing them. Thanks.

Client Senior Manager

Global top 10 pharmaceutical company

RESULTS

Energy savings identified (per year):

Energy savings identified (per year):

4,564,000 kWh

(4,564 MWh)

Energy cost savings identified (per year):

Energy cost savings identified (per year):

$377,000 USD

Emissions reduction (per year):

Emissions reduction (per year):

2,065 tonnes

of CO2 emissions

The savings identified have an estimated overall payback period of less than 2 years. A further $150,000 of annual savings are likely on the remaining HVAC systems not assessed.