HVAC ENERGY REDUCTION IN A PHARMACEUTICAL WAREHOUSE

Site: | Location: USA | Sector: Pharmaceutical Manufacturing

project brief

Our brief was to reduce energy demand without compromising on quality or compliance.

METHODOLOGY

SOLUTION

Following a detailed review of the HVAC system, we implemented the following:

Reduce existing air change rates.

Reduce existing fresh air volume.

Install new VSD’s to the 100kW supply air fans.

Replace the existing supply air diffusers to improve air distribution.

Use existing warehouse HVAC system to serve retained samples store.

Risk based approach to mitigate potential “out of condition” impact.

As well as supporting the HVAC design review, EECO2 also scoped the project before local contractors bid to complete the implementation phase.

Results

Energy savings delivered (per year)

1,950 mWh

Energy cost savings (per year)

$135,000

Emissions reduction (per year)

917 tonnes

of CO2

The project had a simple payback period of less than 2 years.

"Excellent technical knowledge of energy efficiency opportunities and quality of deliverables."
Engineering Director
Global Pharmaceautical Manufacturer

LIKE WHAT YOU SEE?

We can do this for you too. Speak to us today to find out what we can deliver for your business.

OUR CLIENTS

AbbVie

Aesica

ALKERMES

Allergan

Amgen

AstraZeneca

BAYER

Catalent

Eli Lilly

GlaxoSmithKline

Novartis

Pfizer

Pharmavite

Purogenix

Sanofi