EECO2 worked with the site engineering team, providing specialised services based on the site HVAC systems. Energy maps were produced by analysing the data
provided by the site. The previous full year data was used to prepare the maps. These were split by uses and by buildings to identify significant energy uses and locations to focus on.
The teams worked extremely well together on site, having prepared information beforehand, the event was effective in producing multiple projects. The teams created implementation strategies for each project to encourage the site team to continue on and achieve the savings identified.