EECO2 worked with the site engineering team, providing specialised services based on the site HVAC systems. Energy maps were produced by analysing the data
provided by the site. The previous full year data was used to prepare the maps. These were split by uses and by buildings to identify significant energy uses and locations to focus on.
The teams worked extremely well together on site, having prepared information beforehand, the event was effective in producing multiple projects. The teams created implementation strategies for each project to encourage the site team to continue on and achieve the savings identified.

SOLUTION

The solutions below are based on 17 developed projects and 9 ‘Just do it’ projects for the site:

GMP HVAC Optimisation

HVAC Plant Maintenance

Motor Upgrades

Meter monitoring and targeting

Boiler Improvements

Results

Annual energy savings identified:

6,600 MWh

(24% site reduction)

Annual energy cost savings identified:

£200k

(31% site reduction)

Annual CO2 savings identified:

3650 tonnes

(26% reduction)

The savings identified have an overall simple payback period of 3 years.

"Excellent technical knowledge of energy efficiency opportunities and quality of deliverables."
Engineering Director
Global Pharmaceautical Manufacturer

LIKE WHAT YOU SEE?

We can do this for you too. Speak to us today to find out what we can deliver for your business.

OUR CLIENTS

AbbVie

Aesica

ALKERMES

Allergan

Amgen

AstraZeneca

BAYER

Catalent

Eli Lilly

GlaxoSmithKline

Novartis

Pfizer

Pharmavite

Purogenix

Sanofi