  • By completing this form, you confirm that we may contact you via email, that you are over the age of 16 and that we can send you periodic emails, containing useful and interesting information including our email newsletter. Please see our privacy policy for more information and to see how you can manage your consent.

  • Fields marked with an * are mandatory

ecco
Previous case study

COMFORT AND ENERGY IMPROVEMENTS AT A POWDERED BEVERAGE MANUFACTURING SITE

Client: Global consumer beverage manufacturer | Location: India | Sector: CONSUMER HEALTH PRODUCTS

Download

Find out more

Previous case study

PROJECT BRIEF

Our client was experiencing high HVAC energy demand driven by the original system design in order to meet product critical relative humidity conditions during summer months. Forecast energy cost rises of 17% per year were putting increased pressure on budgets.
The brief was to reduce the dehumidification energy demand without compromising operator working conditions and product quality.

METHODOLOGY

EECO2 worked with the site team as part of an Energy Kaizen event to understand the problem in detail.

SOLUTION

This approach led to key recommendations to improve workplace conditions in addition to energy reduction opportunities, as highlighted below:

Achieve dehumidification with chilled water coil as opposed to desiccant wheel with steam recharge, avoiding significant replacement capital costs.

Rebalance HVAC system and reduce air change rates in spreading, scraping and grinding areas.

Reconfigure airflow and pressurisation regime, using existing plant, to reduce working temperatures in rack cooling areas.

Improved filtration strategy to reduce pressure drop and fan energy consumption.

CLIENT TESTIMONIAL

Given the significant anticipated cost rises in energy (forecasted at 17% a year, for the next 3 years) and our projected increase in manufacturing capacity, we must do everything we can to reduce our energy costs.

Site Energy Manager

Global consumer beverage manufacturer

RESULTS

Energy savings (per year)

Energy savings (per year)

591,000 kWh

Energy cost savings (per year)

Energy cost savings (per year)

Rs 2.1m

Emissions reduction (per year)

Emissions reduction (per year)

350 tonnes

of CO2

The project had a simple payback period of less than 2 years and also resulted in improved working conditions whilst avoiding capital cost.