SOLUTION
We initially carried out as found testing for airflow measurements, room balance, ‘as found’ airflow visualisation to ISO 14644 methodology. Our recommendations from this included:
Reduce existing air change rates and recommission and balance each filling room.
Validate new air change rates and airflow distribution using airflow visualisation to ISO 14644 methodology
Validate new cleanroom classification to ISO 14644 methodology
Identify and carry out remediation work on an additional AHU resulting in energy savings and potential future breakdown avoidance
Completed to Planned Change Control, FRS, IOQ documentation
These recommendations also reduced annual maintenance costs on fans, motors and filters and reduced noise levels with positive impact on operator working conditions.
CLIENT TESTIMONIAL
This project delivered 30% of the site’s annual carbon reduction target.
Client
Sterile pharmaceutical manufacturer
RESULTS
Energy savings identified (per year)

455,000 kWh
Energy cost savings identified (per year)

$63,000 USD
Emissions reduction (per year)

387 tonnes
of CO2
EECO2 delivered the HVAC design review, recommissioned the HVAC system and carried out the validation testing to protocol.
We then delivered the additional savings on the remaining rooms based on findings and lessons learned during phase 1.