Phase 1 brief was a trial for 4 out of 8 rooms to reduce air change rate and therefore energy demand while maintaining the required airflow patterns for product protection.
Phase 2 brief was to deliver air change rate reductions on all 8 rooms based on Phase 1 lessons learnt.