GET IN TOUCH

  • By completing this form, you confirm that we may contact you via email, that you are over the age of 16 and that we can send you periodic emails, containing useful and interesting information including our email newsletter. Please see our privacy policy for more information and to see how you can manage your consent.

  • Fields marked with an * are mandatory

ecco

CASE STUDIES

EECO2 operates across the globe. The interactive map below shows some of our latest projects. Click on a dot to see case studies. Results can also be filtered by using the dropdowns below.

Please note that due to client confidentiality, most case studies are anonymised.

Map
United Kingdom

Select a case study to find out more:

China

Select a case study to find out more:

India

Select a case study to find out more:

Puerto Rico

Select a case study to find out more:

Cape Town

Select a case study to find out more:

Australia

Select a case study to find out more:

Singapore

Select a case study to find out more:

USA

Select a case study to find out more:

Japan

Select a case study to find out more:

South East Asia

Select a case study to find out more:

Italy

Select a case study to find out more:

Philadelphia, USA

Select a case study to find out more:

Kenya

Select a case study to find out more:

Ireland

Select a case study to find out more:

Delaware, USA

Select a case study to find out more:

BROWSE RESULTS

Swipe left and right to browse case studies.

Identifying opportunities for energy and water usage reduction at a UK vaccine manufacturing facility

United Kingdom | BIOPHARMACEUTICAL MANUFACTURING | HVAC, Energy efficiency, Energy assessment, BMS optimisation, Water assessment

project brief

EECO2 were commissioned to examine, quantify and report on the opportunities for energy and water usage reduction at a UK vaccine manufacturing facility

OUR RESULTS

Energy savings identified (per year):

4,283,000 kWh

23% reduction in site energy usage

Energy cost savings identified (per year):

£322,000

Water savings identified (per year):

13,674 m3

52% reduction in site water consumption

Site master planning for sustainability

South East Asia | BIOPHARMACEUTICAL MANUFACTURING | HVAC, Energy efficiency, Facility design

project brief

Our client was planning to build a new manufacturing facility in Asia and requested a complete review of the concept design with evaluated options to optimise the energy performance of the facility.

OUR RESULTS

Energy savings

60%

From design optimisation

Energy savings

74%

From design plus HVAC optimisation

LIKE WHAT YOU SEE?

We can do this for you too. Speak to us today to find out what we can deliver for your business.

Get in touch

OUR CLIENTS

AbbVie

Aesica

ALKERMES

Allergan

Amgen

AstraZeneca

BAYER

Catalent

Eli Lilly

GlaxoSmithKline

Novartis

Pfizer

Pharmavite

Purogenix

Sanofi