  • By completing this form, you confirm that we may contact you via email, that you are over the age of 16 and that we can send you periodic emails, containing useful and interesting information including our email newsletter. Please see our privacy policy for more information and to see how you can manage your consent.

  • Fields marked with an * are mandatory

ecco

CASE STUDIES

EECO2 operates across the globe. The interactive map below shows some of our latest projects. Click on a dot to see case studies. Results can also be filtered by using the dropdowns below.

Please note that due to client confidentiality, most case studies are anonymised.

Map
United Kingdom

Select a case study to find out more:

China

Select a case study to find out more:

India

Select a case study to find out more:

Puerto Rico

Select a case study to find out more:

Cape Town

Select a case study to find out more:

Australia

Select a case study to find out more:

Singapore

Select a case study to find out more:

USA

Select a case study to find out more:

Japan

Select a case study to find out more:

South East Asia

Select a case study to find out more:

Italy

Select a case study to find out more:

Philadelphia, USA

Select a case study to find out more:

Kenya

Select a case study to find out more:

Ireland

Select a case study to find out more:

BROWSE RESULTS

Swipe left and right to browse case studies.

Identifying opportunities for energy reduction at an aseptic pharmaceutical manufacturing facility in Italy.

Italy | PHARMACEUTICAL MANUFACTURING | HVAC, Energy assessment, BMS optimisation

project brief

EECO2 were commissioned to deliver an HVAC energy focussed assessment of this aseptic pharmaceutical manufacturing site.

OUR RESULTS

Energy savings identified (per year):

13,621,000 kWh

(13,621 MWh)

Energy cost savings identified (per year):

€944,000

20% reduction in site energy costs

Emissions reduction (per year):

3,518 tonnes

of CO2 emissions

Comfort and energy improvements at a powdered beverage manufacturing site

India | CONSUMER HEALTH PRODUCTS | HVAC, Energy efficiency

project brief

The brief was to reduce the dehumidification energy demand resulting from the original system design without compromising operator working conditions and product quality.

OUR RESULTS

Energy savings (per year)

591,000 kWh

Energy cost savings (per year)

Rs 2.1m

Emissions reduction (per year)

350 tonnes

of CO2

Identifying opportunities to reduce energy demand at a pharmaceutical manufacturer in Singapore

Singapore | PHARMACEUTICAL MANUFACTURING | HVAC, Energy efficiency, Energy assessment

project brief

EECO2 were tasked to reduce energy demand at the client site, without compromising on compliance or laboratory safety.

OUR RESULTS

Energy savings identified (per year):

2,200 MWh

Energy cost savings identified (per year):

$347,000

Emissions reduction (per year):

985 tonnes

of carbon emissions

HVAC energy audit for R&D facility and implementation plan

Philadelphia, USA | RESEARCH & DEVELOPMENT LABS | HVAC, Energy efficiency, R&D, Laboratories

project brief

EECO2 were appointed to deliver a prioritised implementation plan for a large R&D facility

OUR RESULTS

Energy savings identified (per year):

30,995MWh

Energy cost savings identified (per year):

$1,459,000

22% reduction in site energy costs

Emissions reduction (per year):

11,304 tonnes

of carbon emissions

Identifying opportunities for fume cupboard energy reduction at R&D chemistry laboratories in the UK

United Kingdom | RESEARCH & DEVELOPMENT LABS | Energy efficiency, Energy assessment, R&D, Laboratories

project brief

EECO2 were commissioned to deliver an assessment of fume cupboard energy consumption at UK R&D chemistry laboratories

OUR RESULTS

Energy savings delivered (per year)

293,000 kWh

Energy cost savings (per year)

£12,000

Emissions reduction (per year)

75.4 tonnes

of CO2

EECO2 were tasked with developing a strategy to reduce water usage, as the water supply was at a critical level.

Cape Town | HIGH TECH INDUSTRIES |

project brief

With the aim of reducing water usage for the site, the EECO2 team worked with the site to develop a water reduction strategy to do just that.

OUR RESULTS

Water savings identified (per year):

47%

Water savings potential identified from projects

Water savings identified (per year):

16%

Water savings from rain water harvesting

Water cost savings identified (per year):

ZAR 562k

Blow fill seal (BFS) filling room air change rate reduction

Australia | PHARMACEUTICAL MANUFACTURING | HVAC, Energy efficiency, Energy assessment, Facility design

project brief

Existing HVAC system designed to provide Grade A room conditions at high energy cost. Process changes resulted in requiring a Grade C room as background for a BFS filling line.

OUR RESULTS

Energy savings identified (per year)

455,000 kWh

Energy cost savings identified (per year)

$63,000 USD

Emissions reduction (per year)

387 tonnes

of CO2

Tablet manufacturing suite heating, ventilation and air conditioning system upgrade

Cape Town | PHARMACEUTICAL MANUFACTURING | HVAC, Energy efficiency

project brief

EECO2 was asked to assist in reducing energy demand at a tablet manufacturing facility without compromising product quality or regulatory compliance.

OUR RESULTS

Energy savings (per year)

363,000 kWh

Energy cost savings (per year)

£36,000

Emissions reduction (per year)

336 tonnes

of CO2

Trials to safely reduce energy consumption of fume cupboards using C-foils

United Kingdom | RESEARCH & DEVELOPMENT LABS | HVAC, Facility design

project brief

Our brief was to examine whether C-foils could be safely used in reducing fume cupboard energy consumption and to what degree.

OUR RESULTS

Energy savings delivered (per year per fume cupboard)

12,900 kWh

Energy cost savings (per year per fume cupboard)

£371

Emissions reduction (per year per fume cupboard)

3 tonnes

of CO2

Identifying energy reduction opportunities for a HVAC system in effervescence manufacturing area.

United Kingdom | PHARMACEUTICAL MANUFACTURING | Manufacturing, HVAC, Energy efficiency, Energy assessment

project brief

Our brief was to reduce fresh air and energy demand without compromising on product quality or compliance.

OUR RESULTS

Energy savings delivered (per year)

1,500 mWh

Energy cost savings (per year)

£58,000

Emissions reduction (per year)

686 tonnes

of CO2

LIKE WHAT YOU SEE?

We can do this for you too. Speak to us today to find out what we can deliver for your business.